2024-08-02 |
|
|
The floor drain cover is broken and sunken in. This happened again. Sorry- We think it was the cart with the muffin pans, which gets pretty heavy. We will let everyone know not to do this.
It seems like it could collapse in if it were to be stepped on the right way, which could be a
safety risk. I put a floor sign over it, plus red tagged it.
Thanks! |
|
|
replaced |
|
2024-08-01 |
Other |
grease bearings |
grease all 3 inserts on each mill |
|
|
Complete |
|
2024-08-01 |
Plumbing |
|
Using Gas Sniffer check all gas operated for leaks or potential |
|
|
Checked all gas and all good |
|
2024-07-31 |
Other |
Two poles red tagged in mill room |
The poles being used as blockers so mills don't get hit. One has gaps on the bottom area, if you can fill that in, so water and fruit flies leave that area be great. the other one is really lose by the bigger mill. thank you |
|
|
repaired |
|
2024-07-31 |
Other |
Floor machine again |
see email and videos |
|
|
complete |
|
2024-07-31 |
Other |
Egg room tile's molded big time, smelling, missing, very loose |
There was a ton of water and loose tiles underneath the pot and pan rack where the water runs to in the egg room, which in fact has a bunch of tiles that were ruined, and mold underneath the tiles as well...and smelled really bad |
|
|
Added to floor work order |
|
2024-07-31 |
Other |
recaulk and fix seal for pastry freezer, lots of mold and water |
I cleaned the mold around and the yellow caulking stuff near the top of the freezer door area, is missing some in an area, it had a ton of mold there, and if that whole line of caulking could get recalled be great. And the seal for the freezer is off in multiple places causing leaks and molding on the floor |
|
|
As I shared with you the last time we are holding tight and not replacing the door right now |
|
2024-07-30 |
Other |
Sealant where the new bread mixer is the gray one by the other bowl ones. |
Please seal around the legs of this newer mixer, that is stationary in bread. by the other mixers. It has a gap underneath the legs and water etc is getting under there. |
|
|
cannot be done |
|
2024-07-30 |
Other |
add hook for water hose |
Add hook for water hose in the bread mix area so that hose can be hung up fully off the ground (to keep it clean and to help to clean the floors). I marked location on the wall with tape that should work, but feel free to adjust to ensure the hose would be fully off the ground. |
|
|
There was a hook already for the hose! They must not have been using it. Candace is aware |
|
2024-07-29 |
Other |
fix tile under the revent ramp in bread for the oven that is working |
We cleaned under it today. |
|
|
Clean under it first please and we will replace tile. It is filthy still! It might take more than a mop. |
|
2024-07-29 |
Other |
Floor machine again |
Viper one, same thing, not as loud tho, it is not locking in place correctly eitherpleaje check it out. I did send a short video |
|
|
dup |
|
2024-07-29 |
Other |
Floor machine again |
Viper one, same thing, not as loud tho, it is not locking in place correctly eitherpleaje check it out. I did send a short video |
|
|
I put the brush on 4 times in a row with no problem |
|
2024-07-29 |
Walk-In |
|
Vacuum Water from under compressors to prevent water leaking into delivery room. |
|
|
ok |
|
2024-07-29 |
Mixer |
|
I was just told we are missing a set of the wheels that go under the mixing bowls. Are they currently in maintenance? |
|
|
replaced set |
|
2024-07-28 |
Electrical |
|
Wall sheeter’s cord has exposed wires where it connects to the outlet and at its base. |
|
|
repaired |
|
2024-07-28 |
Other |
put a seal around entire bottom of new machine in bread |
something stronger then reg caulking to prevent water from going under the legs and machine itself. |
|
|
SEE NOTES |
|
2024-07-26 |
|
|
Drain condensation from air compressor tanks of both stationary air compressors |
|
|
ok |
|
2024-07-26 |
Other |
40 quart whisk |
1 whisk has a broken wire that needs to be cut, and the second is missing a screw. |
|
|
repaired |
|
2024-07-25 |
Other |
wire rack in pastry dish room, 2 prongs are poking out |
I did red tag it, it's the the removable piece from the horizontal rack. Got poked from it today |
|
|
Replaced rack |
|
2024-07-24 |
Other |
Please replace round drain grate cover by side of LVO |
It is smashed in |
|
|
removed duplicate |
|
2024-07-24 |
Other |
Blue floor machine, stops a lot doesn't want to go |
This has been that ongoing problem that got better then got worse again, and we been using the VIPER but now we using the Blue one again. if it can get looked at. We have to turn it off and on to get it to go. It will just stop. |
|
|
repaired and shot video of how to put the brush on |
|
2024-07-24 |
Other |
floor drain near LVO / 3 compartment sanitation sink |
The floor drain cover is broken and sunken in. It seems like it could collapse in if it were to be stepped on the right way, which could be a safety risk. I put a floor sign over it, plus red tagged it. |
|
|
Removed duplicate |
|
2024-07-23 |
Other |
Fix tile and put a sealant where the tile meets cermaic tile also by bagel area |
Tiles needing replacing are by the basket rack area by the ceramic tile. Need some type of sealant between the two different tiles all the way down there on that side. |
|
|
we will be replacing ceramic tile with linoleum sometime this year |
|
2024-07-23 |
Other |
Please replace missing and damanged tiles under all revent ramps in pastry rack ovens |
|
|
|
Added to floor work order |
|
2024-07-23 |
Other |
Please replace bolt, and screws for pastry rack oven, 1 and 2 |
One had two screws, and the other only one bolt. These also may need adjusting for pastry usage |
|
|
they do not bolt ramps anymore, they are heavy enough that they do not move and it makes it easier to clean under |
|
2024-07-23 |
Other |
Please after fixing tiles,under rack oven 3 and 4 in pastry, bolt them down to the floor |
niether was bolted down, safety hazard |
|
|
the previous work order covers replacing all tiles in pastry Revents |
|
2024-07-23 |
Other |
replace tiles in Scaling bucket hallway that go up against the scaling walk in |
|
|
|
I cannot replace the tiles in front of the scaling walking door. If I do you won't be able to open the door |
|
2024-07-23 |
Other |
replace tiles under chest freezer where it meets the freezer for pastry, and in front of pastry freezer |
They are all broken and corroded. |
|
|
Added to floor work order |
|
2024-07-23 |
Other |
Fix seal on pastry freezer that is leaking all over egg room floor, |
and those tiles need replacing in front of the door as well |
|
|
See Notes |
|
2024-07-22 |
Walk-In |
|
Vacuum Water from under compressors to prevent water leaking into delivery room. |
|
|
ok |
|
2024-07-22 |
HVAC |
|
Check filters and replace when necessary. Check P traps for condensation and drain as necessary. Check condensor coils. WEEKLY DURING SPRING SUMMER, MONTHLY AFTER FIRST FREEZE |
|
|
replaced filter and cleaned traps |
|
2024-07-22 |
|
|
Small plastic bearing in drum broken |
|
|
I removed it so it does not get caught in the dough. The other drums do not have that plastic piece. I am not worried with it missing. |
|
2024-07-19 |
Other |
floor machine brush is hitting plastic guard from inside |
Put the brush on and run it on the floor with it on, and you will hear it......thank you |
|
|
From what Tom and Ben can tell, there is nothing wrong with the machine, the noise is just part of the mechanism that spins it and holds it in place. We can run it without worry. |
|
2024-07-18 |
Other |
replace few tiles where the egg Erika sits in bread |
It took all three of us to move that machine today due to being stuck in the holes area of tiles that need to be replacing. please replace |
|
|
Replaced tiles |
|
2024-07-18 |
Other |
Viper floor machine check the plastic piece it sounds like it is rubbing somewhere |
not the little brush thing on the outside, the actual plastic that covers where the brush is. |
|
|
Could not verify. Machine runs smoothly |
|
2024-07-18 |
Other |
Truck freezer cooler |
The clips to lock the freezer closed are broken three of them. Truck one it is in the Delivery side bay. I'm not sure if you have replacement. |
|
|
repaired latches |
|
2024-07-17 |
Other |
broken wheel on egg room wire rack |
Broken wheel on large wire rack against green stairs in egg room. It doesn't really get moved around but I found the broken pieces next to it this morning and it has a lot of weight on it. I red tagged the wheel that is broken (back left). |
|
|
Replaced wheel |
|
2024-07-17 |
Other |
replace broken vertical molding |
Please replace broken vertical molding on other side of wall between the pastry dish room and egg room. It has broken further since the June work order and has more jagged edges. Picture attached for clarity. |
|
|
Replaced edge trim |
|
2024-07-15 |
Walk-In |
|
Vacuum Water from under compressors to prevent water leaking into delivery room. |
|
|
ok |
|
2024-07-14 |
|
|
Rubber rectangular piece on egg cracker plug is coming off. I taped it so it would fall off. I’m attaching a pic. |
|
|
Repaired |
|
2024-07-12 |
Oven |
|
On 12 door Oven; Blow out burners, clean |
|
|
cleaned and vaccuumed |
|
2024-07-12 |
|
|
De-grease, and re-grease bowl lifter lift pole and chain. |
|
|
greased chain |
|
2024-07-11 |
|
|
The nozzle for the honey barrel drips even when closed. Drips from the opening of the nozzle and not where it screws into the barrel. |
|
|
replaced nozzle |
|
2024-07-10 |
|
|
Wall hook for one of the 140qt whisks is missing a screw |
|
|
Replaced screws on hook |
|
2024-07-09 |
Other |
Floor scrubber batteries |
Check battery cell levels and flush out cleaner dilution valve |
|
|
complete |
|
2024-07-09 |
|
|
Door latch is still loose and becoming unlocked allowing venders to just walk in. |
|
|
repaired |
|
2024-07-09 |
Other |
|
Could use some Bread wall sign holders
at least 15. THANKS SO MUCH! |
|
|
Complete |
|
2024-07-08 |
Walk-In |
|
Vacuum Water from under compressors to prevent water leaking into delivery room. |
|
|
ok |
|
2024-07-07 |
Other |
Ceiling panels near Revent 2 |
The panel had fallen in and was causing problems for the oven turning / door opening. When I was taking the video pic John closed the door and the tile actually fell and damaged some pastries. |
|
|
repaired |
|
2024-07-06 |
|
|
Outlet plug for bagel machine feeder is starting to separate again. |
|
|
mismatched plug and sheath... hubbel mixed with legrand. rematched and reinstalled. |