02/02/2026 |
|
|
Oven |
|
Won’t read door as closed |
Tyler |
|
Low |
|
02/02/2026 |
Bread |
|
HVAC |
|
Replace all 4 air filters in bread ceiling ducts. |
BH Maintenance |
|
|
|
02/02/2026 |
Bread |
|
HVAC |
|
Blow flour dust out of cooling unit, and replace filter if necessary. |
BH Maintenance |
|
|
|
02/01/2026 |
Bread |
|
Oven |
|
1. Ensure oven is operating normally
2. Blow debris out of blower wheel
3. Ensure the draft... |
BH Maintenance |
|
|
|
02/01/2026 |
Bakeshop |
|
Plumbing |
|
Replace water filter in back of machine |
BH Maintenance |
|
|
|
02/01/2026 |
BAKE! Back Room |
|
Oven |
BAKE! |
Blow out elements, clean out debris behind control panels, check exhaust valves for all BAKE! ovens |
BH Maintenance |
|
|
|
02/01/2026 |
Bread |
|
Plumbing |
|
Replace Water Filter on MIWE Oven |
BH Maintenance |
|
|
|
02/01/2026 |
|
|
Other |
grease bearings |
grease all 3 inserts on each mill |
BH Maintenance |
|
|
|
02/01/2026 |
Bread |
|
Other |
|
Add two pumps of grease each to the two inserts on the top of the pump motor |
BH Maintenance |
|
|
|
02/01/2026 |
Pastry |
|
Other |
|
Add 2 pumps to each of the inserts on the pump motor and impeller. |
BH Maintenance |
|
|
|
02/01/2026 |
Pastry |
|
Plumbing |
|
Clean and sanitize |
BH Maintenance |
|
|
|
02/01/2026 |
Bread |
|
Plumbing |
|
Replace Water Filter on MIWE Oven |
BH Maintenance |
|
|
|
02/01/2026 |
|
|
Electrical |
Electrical panels |
Blow out all flour and clean panels |
BH Maintenance |
|
|
|
02/01/2026 |
Bread |
|
|
|
With thin rod level should be 30 mm. from top |
BH Maintenance |
|
|
|
02/01/2026 |
Bread |
|
Oven |
|
Door sensor not registering. |
Pat Rourke |
|
Med |
|
01/31/2026 |
Bread |
|
Mixer |
|
Speed 1 Button not working consistently. Possible bad contactor or relay or switch. |
Jake |
|
High |
|
01/31/2026 |
Pastry |
|
|
|
a small piece came off the egg wash gun, where the removable parts connect to the base near the... |
Amy Belz |
|
Low |
|
01/29/2026 |
Bread |
|
Other |
Wheels |
Started a bucket of wheels we have discovered need some love. Will be in the water closest in the... |
Jake |
|
Low |
|
01/27/2026 |
|
|
Other |
|
The floor machine is not dispensing as much water and soap as it normally does during the brushing... |
Bela Maroti |
|
Med |
|
01/26/2026 |
|
|
|
Air compressor condensation |
Drain condensation from air compressor tanks of both stationary air compressors |
BH Maintenance |
|
|
|
01/21/2026 |
|
|
Other |
Wheels on mop bucket |
Seth found a mop bucket that had stuck/wiley wheels and red tagged in Cleaning Room. |
Melissa |
|
Low |
|
01/17/2026 |
Bread |
|
Other |
Cleaning |
Remove panels and clean debris out of dough divider |
BH Maintenance |
|
|
|
01/17/2026 |
BAKE! Back Room |
|
Other |
table |
The table we use for food is very difficult to fold up, could you please look at it? It lives near... |
Susan |
|
Low |
|
01/16/2026 |
BAKE! Back Room |
|
Oven |
|
Can we have steam in Revent #2? |
Susan |
|
Med |
|
01/15/2026 |
Bread |
|
|
|
The “on” lights covering is falling off |
Mikalhia |
|
Med |
|
01/14/2026 |
- Portable |
|
|
|
The wheel on the bowl lift in packaging/production needs to be replaced. |
Jerry Alcenius |
|
Low |
|
01/14/2026 |
- Portable |
|
|
|
The metal hose piece that connects the hose reel to the water source needs to either be tightened... |
Jerry Alcenius |
|
Low |
|
01/14/2026 |
BAKE! Front Classroom |
|
Mixer |
|
Mixer Cord is ripping |
Susan |
|
Med |
|
01/13/2026 |
Pastry |
|
Walk-In |
|
1, There is a large buildup of mold inside the fan housing of the Scaling Pastry walk-in which... |
Bela Maroti |
planned deep cleaning |
High |
|
01/11/2026 |
Pastry |
|
Plumbing |
|
water leaking from burner flange, video sent to Ben |
Nina |
|
Med |
|
01/08/2026 |
Bread |
|
Oven |
|
Deck 5 of Miwe Oven has been having issues with bread programs that are considered steamy like... |
Paul |
|
High |
|
01/05/2026 |
Bread |
|
Mixer |
|
Break not holding and bowl is hard to get on lift |
Jake |
|
High |
|
12/31/2025 |
Bread |
|
Oven |
|
The Miwe oven has been shutting off programs for baking, both before the programmed bake has... |
Paul |
monitoring. same issue from last year, glitchy HMI |
High |
|
12/24/2025 |
|
|
Other |
clean or replace mop sink basin |
remove stain or replace mop sink basin. Thank you, Ben! |
Melissa |
ordered new basin! |
Low |
|
12/09/2025 |
Pastry |
|
Other |
Welding |
All of the welds attached to the pipe under the LVO's floor have broken, along with a couple... |
Ryan Crisenbery |
planned repair in Jan/Feb |
Med |
|
11/29/2025 |
Bakeshop |
|
|
|
slicer blades are dull after holidays |
victoria huyck |
will replace in Jan |
Low |
|
11/26/2025 |
|
|
|
|
Change Air Compressor Oil |
Arend |
planned for Tuesday |
High |
|
11/12/2025 |
- Portable |
|
Plumbing |
|
Right inside the door leading into Production to the immediate LEFT of the retail walk in cooler... |
Jerry Alcenius |
planned for Jan |
Low |
|
10/10/2025 |
- Portable |
|
Other |
Receiving Bank |
Ben, please work with Arend to pump out half of the water in the receiving bank. |
Chris |
Planned for Jan |
Low |
|
09/23/2025 |
|
|
Other |
Truck Ramp |
We need to brake up the cement ramps and put metal one down. So the ramps are further away from the... |
Daniel Greiner |
planning on fabricating an extension for our dock bumpers in Jan/Feb |
Low |
|
09/22/2025 |
|
|
Other |
Add Metal Plate to wall in Bake! where peel sits |
Can we add a plate to the wall in Bake! where the Bread peel sits? We can increase the frequency of... |
Melissa |
waiting for room to be empty |
Low |
|
09/19/2025 |
Bread |
|
Oven |
|
Door 3 and 6 do not close on their own. |
Michael |
Planned for Jan/Feb |
Low |
|
09/14/2025 |
BAKE! Back Classroom |
|
Oven |
|
The top deck of the bread/deck oven does not seem to bake well. Not at temp. It's been that... |
Amy Berger |
Planned for Jan/Feb |
Med |
|
09/07/2025 |
Bread |
|
|
|
Deep hole on tile floor in between the pvc holder and “Tater tot” |
Mikalhia |
Planned for Jan/Feb |
Low |
|
08/28/2025 |
Pastry |
|
Oven |
|
Lights in revent 4 and revent 3 are out |
Brendon |
Planned for Jan/Feb |
Low |
|
08/03/2025 |
Bread |
|
Oven |
|
Lights inside oven are out, maybe two or three still working. |
Mike |
Planned for Jan/Feb |
Low |
|
06/25/2025 |
|
|
Other |
Add smooth paneling to "new" packaging room |
Add smooth paneling to bottom 3/4 of new Packaging room to make it more food safe and easier to... |
Melissa |
Planned for Jan/Feb |
Low |
|
07/24/2023 |
|
|
Other |
replace broken floor tiles |
Replace all broken floor tiles in Delivery Sorting Room.
1. near mill room threshold
2. near... |
Melissa |
planned for feb/march |
Med |