2026-06-04 Other Machine Cleaning Monthly under the feeding belt cleaning / roller de-glazing for the May -> June monthly changeover, as per the sanitation plan.
2026-05-15 The feeding belt has become increasingly loose and floppy. On Thursday it wasn't having issues, but by mid-day Friday it was starting to hang loosely on the left end of the belt and sometimes struggling to feed items into the machine, while being stopped much more easily. Also, unrelated issue, we're still having issues with the adhesive of the of the adhesive fiberglass on the seal pads. It's not adhering to the pads well, falling off easily, and seeming to prefer getting stuck to the film instead. replaced teflon tape across and the side. Calibrated the belt
2026-05-09 Other Machine Cleaning (Slightly late) Monthly under the feeding belt cleaning / de-glazing belt rollers for the April -> May month changeover. Also, our tube of 'Shin-Etsu Silicone Grease' for cleaning and lubricating the blades is running low. Previously it was given to us by Maintenance, do you have any more? If not we can order more. PM completed, deglazed, belt greased
2026-04-14 Other Part Replacement Today the tape on the side seal seal bar pad got snagged and pulled out of the machine, getting slightly twisted along the way. The adhesive on the tape isn't sticking to the pad well anymore and should probably be replaced. I used some packing tape to help keep the seal bar tape attached to the pad to get us through the rest of the day. replaced adhesive fiberglass
2026-03-29 Other Machine Cleaning Monthly under the feeding belt cleaning / roller de-glazing for the March -> April month turnover, as per the sanitation plan. Also the side seal blade has been a bit fussy lately, mostly the bags not separating well on the side seal, requiring us to run the blade at a higher temperature to get it to pull away, and encouraging it to fold on itself or double seal. Might be a good time to look at the blade and pads. complete
2026-02-27 Other Machine Cleaning Monthly cleaning under the feeding belt / de-glazing feeding belt rollers as per the Sanitation plan, for the February to March month changeover. cleaned
2026-02-06 Other Machine Cleaning Monthly under the feeding belt cleaning / roller de-glazing for the January to February month changeover, as per the sanitation plan. cleaned
2025-11-24 We continued to have issues with the shrink wrapper not sealing. Ben fixed the issue once and it had trouble once again later in the shift. We were able to get it going again, but should still be looked at. i belive this issue is fixed
2025-11-23 The piston that drives the seal jaws is freezing again, and is getting to the point where it's doing it daily. We've been able to unjam it by temporarily raising the pressure, but cleaning it out (and maybe installing some sort of cover to protect it?) would probably be better, and it would be a good opportunity to check for defects. I'd like to recalibrate the safety sensors for slightly higher pressure anyway, since it seemed to help with the issues we were having earlier in the week, and it would make it easier for the sealer to unjam itself. replaced piston
2025-11-21 Gap between the two blades at the corner, and a gap between the tape on the pads, are combined creating a consistent string of plastic from that corner. Also, today it developed an incredibly consistent hole in the middle of cross seal 2, which is the seal made after the item being wrapped is inside the machine, specifically by the left side of the cross seal blade. The hole has been very resistant to settings based changes. Paradoxically, cross seal 1 is still working consistently, and the hole is only ever on seal 2 (despite being the same blade making two seals. My suspicion is that the blade or the inner side guard have come loose after initially being in a good position after the blades were replaced. The other part of this work order requires adjusting the blades anyway. Monitoring for a week until Nov 29. ok
2025-09-27 Other Machine Cleaning Cleaning out under the feeding belt / cleaning the feeding belt rollers, for the monthly changeover from September to October, as per the sanitation plan. cleaned last week
2025-09-12 Install new knifes, heat tape, sealing pads WHEN NEEDED. Checked and good
2025-09-01 Install new knifes, heat tape, sealing pads WHEN NEEDED. ok
2025-08-31 Other Machine Cleaning Monthly under the feeding belt cleaning / roller de-glazing for the August->September changeover, as per the sanitation plan. cleaned
2025-08-01 Other Machine Cleaning Monthly under the feeding belt cleaning / roller deglazing for the July to August changeover, as per the food safety plan. cleaned
2025-06-29 Other Machine Cleaning Monthly under the feeding belt cleaning / deglazing of the feeding belt rollers, as part of the Monthly sanitation plan, for the June-July changeover. The feeding belt is drifting hard at the moment, and will need to be readjusted once the rollers are clean. Cleaned
2025-05-03 Other Machine Adjustment The plates for the feeding belt are drooping slightly, causing it to pinch the channel the film runs through when there’s weight on the belt, causing the film to bunch up, causing the machine to jam. The photo and videos are from the last time this happened after a routine cleaning a few months ago. It’s the same issue as that time but slightly less severe. Currently the white plastic bar is acting as a shim to keep to help keep the plate from pinching the film. error on reassembly from deep clean. two screws were left untightened, that fixed it
2025-05-01 Other Machine Cleaning Monthly under the feeding belt cleaning / belt roller de-glazing as per the sanitation plan, for end of June start of May. deep cleaned roller and plates, realigned belt.
2025-04-06 Other Machine Cleaning Monthly cleaning under the feeding belt / roller cleaning and deglazing for the Sanitation Plan, for April. Cleaned
2025-03-06 Other equipment maintenance Monthly? deep clean needed on the shrink wrapper, especially under the main belt area. Film is getting caught on debris underneath and unthreading. cleaned under belt, cleaned roller and blew out
2025-02-12 Install new knifes, heat tape, sealing pads WHEN NEEDED. Just did
2025-02-04 Other Machine Maintenance Monthly cleaning under the feeding belt / deglazing the rollers as part of the sanitation plan. Also the chain for the feeding belt sounds like it's rattling against the housing slightly, while running. cleaned
2025-02-01 Install new knifes, heat tape, sealing pads WHEN NEEDED. ok
2025-01-24 The shrink wrapper stopped sealing- I know Tom is aware and worked on this, but I wanted to officially have a work order in the system. repaired
2024-12-27 Other Equipment Maintenance The set screw which holds the bar that tents the film before the blade is stripped to the point it can’t be tightened fully. The bar itself is slightly too small for the mount so it has a tendency to droop down too far and catch items when it isn’t properly tightened. The blades could probably use a more thorough cleaning / inspection for wear now that the holiday is over, and the pads have a pretty deep groove from usage. The machine also needs the monthly cleaning under the feed belt to remove built up glaze / crumbs. replaced screw
2024-11-21 Other Packaging Machine When there’s weight on the feeding belt, the assembly for the belt rests on the path for the film in the back corner at the right side of the belt, pinching it and causing the film to bunch up or cut. We were able to get through the night by shimming the belt assembly to keep it up off the film, but its a clumsy temporary fix. took slack out of belt
2024-11-08 Other Machine Maintenance End of October / Start of November monthly work order for cleaning under the shrink wrapper feeding belt. The belt is also drifting heavily left / towards the operator. I've adjusted it a couple times, but it still keeps drifting again. decrusted and vacuumed
2024-09-12 Install new knifes, heat tape, sealing pads WHEN NEEDED. complete
2024-09-03 Other Machine Maintenance Today the safety sensors for the side seal blade guards kept being tripped falsely. After sealing, the lights on the side seal switches would indicate that they were detecting a block, and would trip the safety warning while the blades were still fully up. This would happen directly after sealing something, so the machine would run normally briefly and then suddenly stop sealing and throw up the safety alert. I adjusted positioning of the springs on the guards slightly, and it didn't do it for the second half of the shift, but it was very persistent up until that point so I still would like it to be looked at. We also noticed for the last couple of days the machine seems to be sealing 'harder', so it might be the guards are being shaken more than usual. ok
2024-09-02 Other Machine Maintenance Monthly cleaning under the belt / deglazing as part of the Food Safety plan. was completed yesterday
2024-09-01 Install new knifes, heat tape, sealing pads WHEN NEEDED. complete
2024-07-05 Other Machine Maintenance Monthly cleaning under the feeding conveyor belt / deglazing, as part of the Sanitation plan, for end of June / start of July. cleaned
2024-05-11 Other Machine Maintenance Switch current side seal blade (which is actually a cross seal blade) to an actual side seal blade. Not hugely problematic, but it does cause minor issues and we have to run the machine hotter than normal. complete
2024-05-11 Other Machine Maintenance Packaging needs a new tube of the Shin-Etsu silicone grease for the lubrication and upkeep of the sealing blades. If I remember correctly maintenance should still have 1 or 2 in stock. complete
2024-05-11 Other Machine Maintenance Monthly under the belt cleaning / deglazing for the shrink wrapper feeding belt. I think we missed the April to May monthly cleaning. It was cleaned in April, I cleaned it.
2024-04-02 complete
2024-03-31 Other Machine Maintenance Monthly work order for the cleaning / deglazing of the feeding belt as part of our sanitation plan. I think this might have happened already last week during the other, unrelated work orders for the machine. If it did then it probably doesn't need it again until the end of April. complete
2024-03-27 Other Machine Maintenance Please hold off on swapping the side seal blade until after Easter. We're running it hotter than we'd prefer to, and the dead zone on the left side of the blade is problematic, but otherwise it's sealing well and seems to be stable. I'd like to wait until we're past the Easter rush / American Spoon Cakes / Sour Cream Coffee cake Promo before we change it around again. consider it done
2024-03-04 Other Machine Maintenance When the Shrink Wrapper is first started, or left idle for more than a few minutes the following happens when the machine attempts to seal: * The machine makes a pneumatic click sound * The blade doesn't move * After a moment, the screen displays the seal bar jam error, even though there isn't a jam, and needs the cycle stop reset button to be hit It occurs pretty consistently, but we haven't found a consistent way to clear the issue. We've found that bumping the guards, opening and closing the door to reset the pressure, and hitting the manual seal button more rapidly seem to make the problem work itself out, but none of these solutions work consistently. The issue doesn't persist for long, usually taking us less than a minute to resolve, but it happens pretty consistently and has been a mild annoyance for about a month. Increase pressure and checked all sensor connections
2024-01-27 Other Machine Maintenance Deep cleaning as part of the monthly sanitation plan, under the feeding conveyor belt / belt roller deglazing. complete
2023-12-23 Other Machine Maintenance Monthly cleaning under the belt / cleaning the rollers for the monthly sanitation plan. Also there's a buildup of stuff under the guards for the blades which also needs to be cleaned. cleaned
2023-11-08 Other Machine Maintenance There's a small crack, currently about an inch long, forming in the feeding conveyor belt of the shrink wrapper, on the right side of belt. It's not large enough to cause problems, but I'm hoping we can repair or patch it before it gets bigger. I know the conveyor belts are very expensive. belt misaligned - aligned belt and removed damaged part of belt
2023-10-31 Other Machine Maintenance The width adjustment handle fell off again, just the plastic handle though, so it still fully functions if you turn the wheel. At time of writing the handle is taped to the machine to make it easy to find. issue resolved
2023-10-25 Other Metal feet on shrink wrapper engaged The large metal feet on shrink wrapper are down on the one side and making it hard for the machine to be moved when necessary. Maybe the idea is not to move it? But it’s tearing up the floor because it does need to get moved sometimes. lifted feet up to allow free movement with wheels
2023-10-24 Other Machine Maintenance On the cross seal, in the area around the 20 width mark, the blade is failing to fully cut / separate the plastic. Problem started today. Around the 20 width mark there appears to be some plastic buildup which we haven't been able to get out using our standard blade cleaning procedure. Also I don't know for certain if it impacts performance or not, but the height of the two blades isn't aligned. The pads have also gotten worn out; there's a distinct groove running down the center of each where the blade has been hitting them. The tape is also somewhat worn out and discolored. cleaned
2023-10-24 Other Machine Maintenance Monthly under the belt cleaning / deglazing as part of the sanitation plan. cleaned
2023-09-12 Install new knifes, heat tape, sealing pads complete
2023-09-01 Install new knifes, heat tape, sealing pads completed last week
2023-08-26 Other Machine Maintenance Monthly deep cleaning / deglazing under feeding belt for sanitation plan. cleaned and lubed, knives look good, pads are good
2023-06-27 Other Cleaning Please deep clean interior of machine / under the belt. cleaned out