2023-07-31 |
Walk-In |
|
Vacuum Water from under compressors to prevent water leaking into delivery room. |
|
|
Vacuum water |
|
2023-07-31 |
Other |
hand soap dispenser for kitchen hand sink- near proofer |
The soap dispenser has a continuous small leak, which is wasting soap and corroding the sink faucet. |
|
|
will monitor |
|
2023-07-31 |
Other |
hot water handle for pastry hand sink |
The hot water handle (left) is being corroded by a continuously dripping faulty soap dispenser (separate work order written for this) and is causing the handle to corrode and is now sharp. |
|
|
repaired |
|
2023-07-30 |
Other |
Canister vacuum should in thr cage or there abouts in Cleaning room needs the end plug fixed again there no power |
No power they thought it was the end plug again. |
|
|
complete |
|
2023-07-30 |
|
|
"daytime invoices" file holder needs to be reattached to wall near Delivery receiving door |
|
|
complete |
|
2023-07-30 |
|
|
bread guard on the Oliver gravity slicer is still falling off during operation. Needs a longer bolt and/or some kind of cap/nut to hold in place. |
|
|
tightened bolt |
|
2023-07-28 |
|
|
Phone in mixing area was knocked off the wall and shattered. |
|
|
replace head set |
|
2023-07-27 |
Mixer |
|
Does anyone know where the 5qt hobart mixer is? |
|
|
do not |
|
2023-07-26 |
Other |
light bulb in break room |
ceiling light bulb in center area is flickering |
|
|
CHANGED |
|
2023-07-26 |
|
|
Drain condensation from air compressor tanks of both stationary air compressors |
|
|
complete |
|
2023-07-25 |
|
|
The electric oil gun in the mix area has a leak. |
|
|
repaired |
|
2023-07-24 |
Walk-In |
|
Vacuum Water from under compressors to prevent water leaking into delivery room. |
|
|
vacuumed water |
|
2023-07-24 |
Other |
replace missing base board |
Replace missing base board in Delivery under fuse boxes. The surface without the base board is rough and hard to clean, and therefore creates an area for pathogens to grow. |
|
|
complete |
|
2023-07-24 |
Other |
replace broken floor tiles |
Replace all broken floor tiles in Delivery Sorting Room.
1. near mill room threshold
2. near bread bakery threshold/door hinges
3. Under Revent ramps
4. middle of room- at least 3 obvious spots
5. near hallways threshold
6. By pastry freezer/under chest freezer
7. In egg room under pots and pans - perpetual water
8. By Sir Mixalot, two gouges in tile
9. In bread locker room by 9 door
10. In pastry walk in by eggs and chicken |
|
|
planned for feb/march |
|
2023-07-24 |
Other |
more baseboard missing |
One more spot of missing baseboard
On right side of garage door in hallway between delivery & pastry
Thank you! |
|
|
complete |
|
2023-07-24 |
Other |
Door Sweeps |
Delivery Door SIDE door sweep looks like it got hit by something- bent and created a large gap for pests to enter the building.
Bread Mix Area door sweep has gap at bottom. I suspect we'll just have to keep redoing this one frequently. |
|
|
repaired |
|
2023-07-23 |
Electrical |
|
Oven vacuum plug broke, bare wire showing |
|
|
repaired |
|
2023-07-22 |
HVAC |
|
Check filters and replace when necessary. Check P traps for condensation and drain as necessary. Check condensor coils. WEEKLY DURING SPRING SUMMER, MONTHLY AFTER FIRST FREEZE |
|
|
Complete |
|
2023-07-20 |
Other |
Flour pallet dolly |
The wheel is getting stuck in a sideways position while moving it making it hard to push need replaced or fixed |
|
|
Replaced all 4 wheels |
|
2023-07-20 |
|
|
I see that the white front piece has been reattached to the cookie machine but it is still quite loose. Do we need to tighten it somehow? |
|
|
complete |
|
2023-07-20 |
Other |
BAKE! Back Door |
The BAKE! back door closes but does not lock. I called Lugz regarding this problem. Thanks! |
|
|
complete |
|
2023-07-19 |
Other |
2 fan as you walk in Scaling #8 walk in, is not staying on! |
We were cleaning the fan covers and noticed the fan was itself off, and there is a funny nut to hold it on, we tried to put it back on twice with the nut and it will not stay. Please re attach with a better nut that will hold it. |
|
|
repaired |
|
2023-07-18 |
Other |
replace bulb in one of Bakeshop bug lights |
|
|
|
ordered bulbs |
|
2023-07-18 |
Other |
Plug outlet falling from ceiling |
Plug outlet is falling out of ceiling |
|
|
complete |
|
2023-07-17 |
Other |
vent from LVO on top of it, in back corner |
Not the first time i seen it musta been spitting out black stuff all over the machine, and the side wall. I took a couple of pics i will send |
|
|
|
|
2023-07-17 |
Other |
Replace broken ceiling light cover in Scaling |
|
|
|
complete |
|
2023-07-17 |
Walk-In |
|
Vacuum Water from under compressors to prevent water leaking into delivery room. |
|
|
vacuumed water |
|
2023-07-17 |
Other |
Replace tiles |
Description: Replace cracked tiles in the following Pastry areas-
1. Behind mixers
3. Egg room- near wall shared with dish room
4. Egg room- below green stairs and near cleaning room door |
|
|
repaired |
|
2023-07-17 |
Oven |
|
9 Door loader at the front(closest to the oven) has temporary wheels, but needs the new wheels and a new rod that extends side to side and connects both sides of the loader. As it is there is too much flexibility at the end of the loader and it is damaging bread as we load. I can show you if this sounds confusing..thanks |
|
|
reinforced |
|
2023-07-16 |
Other |
tiles around ovens #1 & #2 |
Please put back/replace any missing ceiling tiles around ovens #1 and #2 in the Pastry kitchen. |
|
|
complete |
|
2023-07-16 |
Lights |
|
Please replace out light bulbs and missing shield on light between oven #1 & #2 in Pastry Kitchen. |
|
|
that light needs to be removed, it is not needed |
|
2023-07-16 |
Other |
Cooling rack |
Bread cooling rack with red tag has bad wheel |
|
|
repaired |
|
2023-07-15 |
|
|
Lower fan in Delivery is stuck on an angle, won't cool bread racks efficiently |
|
|
Complete |
|
2023-07-14 |
Other |
fan by delivery |
chain that turns fan on / off is broken off. Fan cannot turn on. Chain is in a deli cup in the pastry managers office on the desk. |
|
|
complete |
|
2023-07-13 |
Other |
|
Fan in Douglas area is hitting the shield. |
|
|
complete |
|
2023-07-12 |
Oven |
|
On 12 door Oven; Blow out burners, clean |
|
|
cleaned |
|
2023-07-12 |
|
|
De-grease, and re-grease bowl lifter lift pole and chain. |
|
|
complete |
|
2023-07-12 |
Other |
Hose leaking in bagel area & install hose caddy |
The red hose in the bagel area has a leak at the nozzle. (It caused a mini flood in the Production Manager's office due to the excess water seeping through the wall :( I turned off the water to the hose and Emily is aware. And Seth helped me clean it up :))
Can you also install a hose caddy on the wall above the hose so that the hose can be stored off the floor? |
|
|
complete |
|
2023-07-11 |
Plumbing |
|
Leak under Sani sink in bread |
|
|
I WILL BE REPLACING THE ENTIRE SINK |
|
2023-07-11 |
HVAC |
|
Our AC unit does not appear to be running properly or at all. Monday 7/10 Alex and I noticed the temperature was 74 despite the unit being set at 70, and Tuesday 7/11 I noticed a clicking or dripping sound and the temperature is now at 78. |
|
|
ok |
|
2023-07-10 |
Walk-In |
|
Vacuum Water from under compressors to prevent water leaking into delivery room. |
|
|
vacuumed water |
|
2023-07-10 |
Other |
replace cracked tiles |
Replace cracked tiles in the following Pastry areas-
1. Behind mixers
2. Egg room- near threshold of dish room
3. Egg room- near wall shared with dish room
4. Egg room- below green stairs and near cleaning room door |
|
|
replaced |
|
2023-07-09 |
Other |
Floor scrubber batteries |
Check battery cell levels and flush out cleaner dilution valve |
|
|
complete |
|
2023-07-09 |
Other |
Small Mill |
Small mill needs to have stones separated, cleaned, and reset. |
|
|
talked with Hazim he will check it out |
|
2023-07-05 |
Other |
Floor machine going to yellow |
The lights are still going to yellow on us when it should not nearly be down to that. Batteries?
Or something electrical? |
|
|
Please give me more information. How long did machine run before yellow light? |
|
2023-07-03 |
Other |
floor machine moves on it on, won't stop unless we turn it off |
Just started doing this late today, never seen it go on its on, and then not stop..then after we turn it off, it will not come back on. We would plug it in a bit and then hope it come back on. |
|
|
repaired |
|
2023-07-03 |
Walk-In |
|
Vacuum Water from under compressors to prevent water leaking into delivery room. |
|
|
CLEANED |
|
2023-07-02 |
|
|
Pallet dolly wheel won’t turn under weight |
|
|
Repaired |
|
2023-07-01 |
Plumbing |
|
Using Gas Sniffer check all gas operated for leaks or potential |
|
|
checked all appliances |
|
2023-07-01 |
Other |
secure paper towel holder |
Paper towel holder needs to be better secured in Delivery Room and/or replaced with one without a lever. Any time the lever is moved to get paper towel the entire unit shifts back and forth on the wall. This is not only annoying, but not very food safe as you need to basically recontaminate both of your hands to get the paper towel out of the dispenser. |
|
|
secured |