2024-03-28 |
|
|
Time for the compressors to be cleaned in retail, thanks!! |
|
|
complete |
|
2024-03-13 |
|
|
Draining tables need new wheels |
|
|
replaced wheels |
|
2024-03-06 |
|
|
Wheel on blue recycling cart that needs to be fixed, there is also more wheels on the draining tables that need to be fixed (ask jerry which ones) thank you!!! |
|
|
consolidated w os |
|
2024-02-15 |
|
|
Seal under production door needs to be replaced, letting water out into the hall. Arend is the one to talk to about this |
|
|
Ordered |
|
2024-02-14 |
|
|
The same sink is leaking again in production |
|
|
repaired |
|
2024-02-13 |
|
|
Wheels on our draining table are broken/ need to be replaced. I can email a picture so you can see what they look like |
|
|
replaced |
|
2024-02-05 |
|
|
The wash sink in production is draining constantly, won't even hold water says Jerry.
The water pressure on the sprayer in the packaging room isn't good anymore |
|
|
reattached o-ring on drain stop , cleaned and freed up sprayer |
|
2024-02-05 |
|
|
Light bulb in the finished goods cooler is out. Not sure if this is a Bakehouse fix, Arend is out of state so I thought I'd check with you first |
|
|
replaced |
|
2024-02-01 |
|
|
Tighten up water hose on the back of the batch freezer, leaks water |
|
|
Added PTFE tape and tightened - leak stopped |
|
2024-01-23 |
|
|
The faucet in production tri sink is leaking |
|
|
repaired |
|
2024-01-17 |
|
|
The one shot soap in Retail isn't working properly |
|
|
replaced black Knight flex tube |
|
2024-01-15 |
|
|
Clean out filters in retail, blow out air compressors etc |
|
|
complete |
|
2024-01-09 |
|
|
The pipe to drain the drip pan in the aging room is getting backed up |
|
|
cleared out |
|
2023-12-22 |
|
|
The wheel on our blue recycling bin in the packaging room needs to be repaired, the door panel on the finished goods cooler walking into the packaging room is coming off and needs to be resealed (talk to arend) |
|
|
repaired |
|
2023-12-20 |
|
|
One shot in the tri sink in packaging room is also being wacky |
|
|
recalibrated |
|
2023-12-19 |
|
|
Retail soap one shot (in the tri sink) doesn't seem to be working |
|
|
recalibrated |
|
2023-12-08 |
|
|
Back door handle came off yesterday, needs to be fixed |
|
|
repaired and tightened latch |
|
2023-12-06 |
|
|
Our knife strip needs to be better secured |
|
|
secured |
|
2023-12-06 |
|
|
Need to move broom/brush rack in production |
|
|
moved |
|
2023-12-04 |
|
|
Travis is having trouble with a magnet piece on the Hobart |
300 |
|
fixed |
|
2023-11-13 |
|
|
On our milk pump, there is a small hole on our clear air line. It's close enough to the top that we could cut it and reattach it. Jerry is the one to talk to for this and he can show you, thanks so much!! :) |
|
|
cut and reattached |
|
2023-11-08 |
|
|
The wash sink in production (the first sink in the tri sink) has a slow leak. Usually the valve being worn out? |
|
|
replaced drain in first compartment of sink (wash comp.). the trickle when plugged has been fixed. |
|
2023-11-03 |
|
|
Routine calibration on our foot foamers, sanitizers/soap dispensers in our tri sinks |
|
|
calibrated and functional |
|
2023-11-03 |
|
|
Toilet is clogged, can't get it unclogged with plunger |
|
|
thank you aaron for unclogging |
|
2023-10-27 |
|
|
Routine clean out of compressors in the retail freezer and cooler |
|
|
cleaned out compressor coils |
|
2023-10-27 |
|
|
Routine calibration of the floor foamers, automatic sanitizer and soap for tri sinks |
|
|
duplicate |
|
2023-10-11 |
|
|
Just kidding Tom, Arend mentioned that we need a hose nozzle put on our hose by the pasteurizer. He would be a good person to talk to about it for more info. Thanks so much! |
|
|
is going to send me pic and info to order |
|
2023-09-18 |
|
|
Production door handle, piece broke off, broken |
|
|
repaired |
|
2023-09-12 |
|
|
CIP acid attachment to the guardian system is spraying everywhere. It looks to be corroded. (In the raw room, Jerry is the one to talk to about it). Jerry will be here tomorrow 6am-2pm but he is off Thursday and Friday. |
|
|
replaced |
|
2023-08-14 |
|
|
The gelato dipping case side/seal seems to be in rough shape |
|
30 minutes |
WED Before Opening |
|
2023-08-09 |
|
|
Our raw room freezer (small freezer on the left in raw room) was running at 40 degrees F this morning |
|
|
Emma called CMR, |
|
2023-08-08 |
|
|
Either the freezer or the retail cooler is leaking into retail |
|
|
Called CMR |
|
2023-08-03 |
|
|
Can we have the retail ceiling vent cleaned tomorrow morning before we open? Maybe at 8am? |
|
30 minutes |
complete |
|
2023-07-24 |
|
|
A bunch of wasps by our loading dock. (Jerry can show you). |
|
|
complete |
|
2023-07-17 |
|
|
Clean out the freezer compressors and check the roof filters, put up the last knife strip in packaging room |
|
1.25 HOURS |
complete |
|
2023-07-14 |
|
|
The sanitizer sink in the packaging room has a broken tube |
|
1.0 HOURS |
complete |
|
2023-07-11 |
|
|
The sanitation sink in retail is leaking again |
|
|
unable to find any leaks |
|
2023-06-29 |
|
|
We have some magnetic knife strips to be hung on the wall in production |
|
30 minutes |
complete |
|
2023-06-26 |
|
|
Black specks in milk, thinking that the air heater in the pasteurizer needs to be pulled out and potentially cleaned. Not an emergency. |
|
1.0 HOURS |
complete |
|
2023-06-26 |
|
|
New gelato dipping case needs a glass guard put on it. Arend sent an email with a picture |
|
2.0 HOURS |
complete |
|
2023-06-23 |
|
|
We're thinking of adding a monthly preventative maintenance to pull apart our cutting tool on our packaging machine and clean it so it doesn't leave charred bits that can get into our products. Tuesday is the best day for this because we normally don't use the packaging machine that day |
|
|
scheduled monthly maintenance |
|
2023-06-15 |
|
|
Can we have some routine maintenance done on our bowl lift please? It's in the packaging room! |
|
|
complete |
|
2023-06-15 |
|
|
We have a wheel on one of our new gelato carts that squeaks and only goes one way |
|
|
repaired |
|
2023-06-09 |
|
|
Our employee door is not locking and anyone can get in |
|
|
Complete |
|
2023-05-25 |
Freezer |
|
Big icicles in the main walk in freezer, employee was in there and one crashed down. Potential safety hazard. Arend was wondering if you could take a look and we could talk solutions? |
|
|
complete |
|
2023-05-24 |
|
|
The small freezer in the raw room is reaching 40 degrees and above, wondering if someone could take a look at it before we call CMR or something. Jerry in production can show you the freezer! |
|
|
reset GFI will monitor checked at 1 hr. running fine |
|
2023-05-17 |
|
|
Our auditor docked us because our back employee door has visible light shining through. Maybe time to replace the seal? |
|
1.0 HOURS |
|
|
2023-05-15 |
|
|
Our freezer is leaking water from under the trim along the side of the freezer nearest the production window |
|
|
recaulked |
|
2023-05-10 |
|
|
test |
|
|
TEST CLOSED |
|
2023-05-10 |
|
|
The door handle on our back employee door is loose |
|
|
complete |