2024-12-27 |
|
|
|
|
|
Inspected and Passed |
|
2024-12-27 |
|
|
|
|
|
Inspected, replaced filters and Passed |
|
2024-12-27 |
|
|
|
|
|
Inspected and Passed |
|
2024-12-27 |
|
|
|
|
|
Last summer |
|
2024-12-27 |
|
|
|
|
|
Cleaned in 2023, yes and let me know if I can assist |
|
2024-12-16 |
HVAC |
|
The production room is unreasonably warm despite the thermostat being on COOL and the temp is set at 64. Currently it's 74F and the thermostat is reading 72F. There were 2 alerts. The first alert is that new batteries were needed for the thermostat so I changed those. The other alert was for the humidifier pads need to be changed. I don't know what that is but it may be the issue? |
|
|
CMR is coming out |
|
2024-12-16 |
Plumbing |
|
In the packaging room the santiizer sink's hot water handle is broken. From what I was told the hot water was turned off under the sink because the handle wouldn't close all the way and would still leak water.
Someone came out previously and it worked for a day then went back to it's old ways. Thanks a bunch! |
|
|
Replaced seal |
|
2024-12-11 |
Plumbing |
|
The wash sink in production is slowly losing water while the sink is closed. |
|
|
repaired |
|
2024-11-20 |
|
|
We had the grease trap in retail sealed with silicone calk. It worked great. Took away the stink. Would like to do the same with the two traps in production. If you could silicone seal the edges and "plug" on the grease traps, that would be great. |
|
|
Sealed |
|
2024-11-15 |
|
|
Wire new 240V sandwich press for retail use. |
|
|
a&n will hookup - per arend |
|
2024-11-12 |
|
|
retail coolers and freezers vents need to be cleaned |
|
|
cleaned |
|
2024-11-11 |
Plumbing |
|
The faucet in the packaging room for the three compartment sink that swivels to santiizer and rinse sink is currently dripping water. The water is hot and both handles are turned as far as they can go.
The faucet in PRODUCTION that swivels from rinse to sanitizer is a bit loose so that when the sink is filling it wants to swivel to the wall. |
|
|
Repaired |
|
2024-11-03 |
|
|
Lift lever on Hobart mixer stripped out. Turns all the way around. Hoping it can be refastened for immediate use. |
|
|
replaced roll pin |
|
2024-10-30 |
|
|
Square draining table by pasteurizer needs new wheels. Ben replaced wheels on other draining tables earlier this year. Two wheels broke off yesterday. |
|
|
Wheels replaced |
|
2024-10-24 |
|
|
Sanitizer Pump in mixing room sink is off again. Pumping too much sanitizer in sink. |
|
|
Recalibrated |
|
2024-10-20 |
Other |
gelato pasteurizer |
The agitator cover for the inside of the gelato pasteurizer has broken off. It looks like it was just initially spot welded and it snapped.
This machine is used every single day so the sooner we can fix it the better. I'll be in production all day until probably 4pm if you need to reach out. |
|
|
welded |
|
2024-10-18 |
|
|
Hose rusted and broke off on batch pasteurizer for gelato. |
|
|
repaired |
|
2024-10-13 |
Other |
Freezer compressor vents and cooler vent |
The cooler and freezer compressor vents need to be cleaned. Was told you knew what this meant by Arend. |
|
|
cleaned |
|
2024-10-02 |
Other |
|
Threshold going into production is leaking again, so both thresholds are not great right now. Will need to be replaced or recauked at some point. |
|
|
Replaced both thresholds |
|
2024-10-02 |
Plumbing |
|
The hose that is attached to the sprayer near the gelato area is spraying water when turned on. I feel it may just need some plumbing tape or something wrapped around it. |
|
|
replaced copper piping |
|
2024-09-27 |
|
|
Reset the sanitizer drain pump in the packaging room. Chris knows the limit that he wants, just needs it set to that. |
|
|
Adjusted dose! |
|
2024-09-27 |
|
|
Threshold in mixing room by back garage door needs to be replaced at some point. We had to cut it to get a pallet jack in when warehouse garage door was inoperable |
|
|
duplicate |
|
2024-09-18 |
Other |
Draining Tables |
One of the draining tables in production has a set of back wheels (the bigger ones) that have started to peel off again. |
|
|
Replaced bad wheels |
|
2024-09-18 |
Other |
Floor Foamers |
The floor foamer in production seems to have it's timing off. It's not spraying during the day and is spraying at night. |
|
|
Adjusted to spray during day |
|
2024-09-16 |
HVAC |
|
It's getting hot in the production area. The thermostat is giving 2 notifications of a new filter and changing the humidity pad. Changing the temp doesn't do much to remedy the issue. |
|
|
CMR came out |
|
2024-09-13 |
|
|
Retail walk in cooler is running too cold. High 20's. I haven't had to adjust before. Wondering if you know how to do it quick. Thx |
|
|
Adjusted thermostat. Will monitor |
|
2024-09-13 |
|
|
hobart mixing head is missing paint. Maybe we need to get a replacement head? Would like to get your opinion when you have time. |
|
|
Sanded and painted with black enamel |
|
2024-09-08 |
Mixer |
|
Hobart Bowl needs to be greased |
|
|
cleaned and checked |
|
2024-09-08 |
Other |
Compressor Cleaning |
The Compressors in creamery retail need to be cleaned |
|
|
Cleaned |
|
2024-09-08 |
Other |
Hand Cart needs fixed |
There's a handcart in the hallway in the creamery that needs a new lock nut installed. |
|
|
Tightened nuts! |
|
2024-08-29 |
Plumbing |
|
Retail mop sink is clogged and overflowing If you have liquid plumber or anything like that please bring it |
|
|
plumber came out and cleared clog with large auger |
|
2024-08-08 |
Plumbing |
|
The retail sink drain has a horrible odor even though the grease trap was just cleaned out a few days ago. Wondering if you have any ideas on why this is or how to make the smell go away |
|
|
Could not verify!! |
|
2024-08-07 |
Plumbing |
|
The hot water is not working on our production sinks. |
|
|
it is ok |
|
2024-07-21 |
Plumbing |
|
The controls (hot water, cold water and the one that allows the water to come out of the spigot) are not working. Even if turned off all the way water still spews forth. I have since turned off the water under the sink |
|
|
adjusted seals |
|
2024-07-18 |
|
|
Walk in Freezer door handle is jacked up for awhile and getting worse. See pic. stuck in this position. Would be nice to get a new one put on but maybe just needs some WD40 for the time being. Not an emergency |
|
|
replaced |
|
2024-07-17 |
|
|
Cheese Cup packaging machine needs the sealer realigned. I have a crude SOP on how to do it from manufacturer. An extra set of eyes and hands while I'm doing it would be appreciated. Machine is not very usable right now without trying this. Should take 30-40 minutes. |
|
|
Adjusted pressure regulator down to 35! |
|
2024-07-09 |
Other |
Floor |
The rubber floor divider in the production doorway got dislodged and is now loose |
|
|
reapplied the silicone adhesive |
|
2024-07-03 |
|
|
bottom shelf on stainless steel table in mixing room needs to be refastened. |
|
|
Repaired |
|
2024-07-03 |
|
|
Leaking faucet in mixing room sanitzer sink. |
|
|
Repaired |
|
2024-06-19 |
|
|
Hole in white/clear air line on milk pump in raw room. Need to cut and reattach or repair (not tape) |
|
|
Replaced tubing |
|
2024-05-29 |
|
|
Sanitizer sink in packaging room needs a new seal |
|
|
Replaced gasket |
|
2024-05-28 |
|
|
We have a small roof leak going into the packaging room off of production. It's right by the table, I can show you exactly where it's dripping, just find Emma/Arend |
|
|
assessed roof for holes/tears. Nothing that I saw. There are some exhausts that may allow water in if raining hard. This is for landlord/roof guys. |
|
2024-05-24 |
|
|
Water heater is slow drip leaking in the mezzanine off the upstairs office and now there's water in retail. Wondering if you can come take a look- talk to Arend or Emma about where it is. |
|
|
put cap on hose connection and unscrewed valve because it was too tight, letting water by |
|
2024-05-16 |
|
|
Handcart needs a new wheel. The cart is in the breakroom right off of retail, it has a red tag on it. |
|
|
Replaced wheels |
|
2024-05-07 |
|
|
The other doorknob on the other bathroom is starting to break as well |
|
|
replaced |
|
2024-05-07 |
|
|
The thermostat in the packaging room is not working- new batteries didn't work- need a new one? |
|
|
replaced |
|
2024-05-01 |
|
|
Bathroom door handle fell off |
|
|
replaced handle |
|
2024-04-23 |
|
|
Ceiling tile fell in packaging room above the packaging machine- talk to arend if needed |
|
|
replaced |
|
2024-04-15 |
|
|
The back door where you usually come in at has a broken seal hanging off and you can see visible light through the door, wondering if we could replace that, thank you! |
|
|
complete |
|
2024-04-05 |
|
|
The third sink (on the right) in retail has a faulty seal on the drain, leaking. There's a red tag on the sink |
|
|
complete |