User login

ZING CREAMERY - GENERAL MAINTENANCE

Location: 
- Portable

Work Orders

New work order

Date requestedsort icon Type Problem Cost Time spent Status
2024-12-27 Inspected and Passed
2024-12-27 Inspected, replaced filters and Passed
2024-12-27 Inspected and Passed
2024-12-27 Last summer
2024-12-27 Cleaned in 2023, yes and let me know if I can assist
2024-12-16 HVAC The production room is unreasonably warm despite the thermostat being on COOL and the temp is set at 64. Currently it's 74F and the thermostat is reading 72F. There were 2 alerts. The first alert is that new batteries were needed for the thermostat so I changed those. The other alert was for the humidifier pads need to be changed. I don't know what that is but it may be the issue? CMR is coming out
2024-12-16 Plumbing In the packaging room the santiizer sink's hot water handle is broken. From what I was told the hot water was turned off under the sink because the handle wouldn't close all the way and would still leak water. Someone came out previously and it worked for a day then went back to it's old ways. Thanks a bunch! Replaced seal
2024-12-11 Plumbing The wash sink in production is slowly losing water while the sink is closed. repaired
2024-11-20 We had the grease trap in retail sealed with silicone calk. It worked great. Took away the stink. Would like to do the same with the two traps in production. If you could silicone seal the edges and "plug" on the grease traps, that would be great. Sealed
2024-11-15 Wire new 240V sandwich press for retail use. a&n will hookup - per arend
2024-11-12 retail coolers and freezers vents need to be cleaned cleaned
2024-11-11 Plumbing The faucet in the packaging room for the three compartment sink that swivels to santiizer and rinse sink is currently dripping water. The water is hot and both handles are turned as far as they can go. The faucet in PRODUCTION that swivels from rinse to sanitizer is a bit loose so that when the sink is filling it wants to swivel to the wall. Repaired
2024-11-03 Lift lever on Hobart mixer stripped out. Turns all the way around. Hoping it can be refastened for immediate use. replaced roll pin
2024-10-30 Square draining table by pasteurizer needs new wheels. Ben replaced wheels on other draining tables earlier this year. Two wheels broke off yesterday. Wheels replaced
2024-10-24 Sanitizer Pump in mixing room sink is off again. Pumping too much sanitizer in sink. Recalibrated
2024-10-20 Other gelato pasteurizer The agitator cover for the inside of the gelato pasteurizer has broken off. It looks like it was just initially spot welded and it snapped. This machine is used every single day so the sooner we can fix it the better. I'll be in production all day until probably 4pm if you need to reach out. welded
2024-10-18 Hose rusted and broke off on batch pasteurizer for gelato. repaired
2024-10-13 Other Freezer compressor vents and cooler vent The cooler and freezer compressor vents need to be cleaned. Was told you knew what this meant by Arend. cleaned
2024-10-02 Other Threshold going into production is leaking again, so both thresholds are not great right now. Will need to be replaced or recauked at some point. Replaced both thresholds
2024-10-02 Plumbing The hose that is attached to the sprayer near the gelato area is spraying water when turned on. I feel it may just need some plumbing tape or something wrapped around it. replaced copper piping
2024-09-27 Reset the sanitizer drain pump in the packaging room. Chris knows the limit that he wants, just needs it set to that. Adjusted dose!
2024-09-27 Threshold in mixing room by back garage door needs to be replaced at some point. We had to cut it to get a pallet jack in when warehouse garage door was inoperable duplicate
2024-09-18 Other Draining Tables One of the draining tables in production has a set of back wheels (the bigger ones) that have started to peel off again. Replaced bad wheels
2024-09-18 Other Floor Foamers The floor foamer in production seems to have it's timing off. It's not spraying during the day and is spraying at night. Adjusted to spray during day
2024-09-16 HVAC It's getting hot in the production area. The thermostat is giving 2 notifications of a new filter and changing the humidity pad. Changing the temp doesn't do much to remedy the issue. CMR came out
2024-09-13 Retail walk in cooler is running too cold. High 20's. I haven't had to adjust before. Wondering if you know how to do it quick. Thx Adjusted thermostat. Will monitor
2024-09-13 hobart mixing head is missing paint. Maybe we need to get a replacement head? Would like to get your opinion when you have time. Sanded and painted with black enamel
2024-09-08 Mixer Hobart Bowl needs to be greased cleaned and checked
2024-09-08 Other Compressor Cleaning The Compressors in creamery retail need to be cleaned Cleaned
2024-09-08 Other Hand Cart needs fixed There's a handcart in the hallway in the creamery that needs a new lock nut installed. Tightened nuts!
2024-08-29 Plumbing Retail mop sink is clogged and overflowing If you have liquid plumber or anything like that please bring it plumber came out and cleared clog with large auger
2024-08-08 Plumbing The retail sink drain has a horrible odor even though the grease trap was just cleaned out a few days ago. Wondering if you have any ideas on why this is or how to make the smell go away Could not verify!!
2024-08-07 Plumbing The hot water is not working on our production sinks. it is ok
2024-07-21 Plumbing The controls (hot water, cold water and the one that allows the water to come out of the spigot) are not working. Even if turned off all the way water still spews forth. I have since turned off the water under the sink adjusted seals
2024-07-18 Walk in Freezer door handle is jacked up for awhile and getting worse. See pic. stuck in this position. Would be nice to get a new one put on but maybe just needs some WD40 for the time being. Not an emergency replaced
2024-07-17 Cheese Cup packaging machine needs the sealer realigned. I have a crude SOP on how to do it from manufacturer. An extra set of eyes and hands while I'm doing it would be appreciated. Machine is not very usable right now without trying this. Should take 30-40 minutes. Adjusted pressure regulator down to 35!
2024-07-09 Other Floor The rubber floor divider in the production doorway got dislodged and is now loose reapplied the silicone adhesive
2024-07-03 bottom shelf on stainless steel table in mixing room needs to be refastened. Repaired
2024-07-03 Leaking faucet in mixing room sanitzer sink. Repaired
2024-06-19 Hole in white/clear air line on milk pump in raw room. Need to cut and reattach or repair (not tape) Replaced tubing
2024-05-29 Sanitizer sink in packaging room needs a new seal Replaced gasket
2024-05-28 We have a small roof leak going into the packaging room off of production. It's right by the table, I can show you exactly where it's dripping, just find Emma/Arend assessed roof for holes/tears. Nothing that I saw. There are some exhausts that may allow water in if raining hard. This is for landlord/roof guys.
2024-05-24 Water heater is slow drip leaking in the mezzanine off the upstairs office and now there's water in retail. Wondering if you can come take a look- talk to Arend or Emma about where it is. put cap on hose connection and unscrewed valve because it was too tight, letting water by
2024-05-16 Handcart needs a new wheel. The cart is in the breakroom right off of retail, it has a red tag on it. Replaced wheels
2024-05-07 The other doorknob on the other bathroom is starting to break as well replaced
2024-05-07 The thermostat in the packaging room is not working- new batteries didn't work- need a new one? replaced
2024-05-01 Bathroom door handle fell off replaced handle
2024-04-23 Ceiling tile fell in packaging room above the packaging machine- talk to arend if needed replaced
2024-04-15 The back door where you usually come in at has a broken seal hanging off and you can see visible light through the door, wondering if we could replace that, thank you! complete
2024-04-05 The third sink (on the right) in retail has a faulty seal on the drain, leaking. There's a red tag on the sink complete

Maintenance Record

New maintenance record