Work Order 9091

Type of work: 
Other
Other type of work: 
dock plate unusable due to gap, need temporary filler
Equipment: 
Describe the problem: 
The concrete loading dock is fractured and sinking, making it unusable since delivery drivers are dumping our ingredients onto the ground. Tom and I discussed a temporary gap filler made of a pressure-treated plywood strip to make the dock functional while a long term solution is sought.
Date requested: 
2020-10-28
Date received: 
2020-10-28
Root Cause: 
Part Failure
Status: 
filled in with sand mix 24 hours to cure
Completed: 
completed
Priority: 
High