Work Order 8123

Type of work: 
Other
Other type of work: 
Floor from tile to cement to metal framing back door in bread
Equipment: 
Describe the problem: 
Can anything be done for the gap from tile to the bottom moulding door frame in breads back door? It does a dip and is tile, a dip in the cement then cement to metal moulding.
Date requested: 
2020-03-26
Date received: 
2020-03-26
Status: 
This is has been scheduled to remove tile when things are back to a normal
Completed: 
completed
Priority: 
Low