Work Order

Type of work: 
Other
Other type of work: 
Moulder wiring.
Equipment: 
Describe the problem: 
Got a call from John at 9:30 pm saying the moulder was sparking.Came in at 3:30am to make the repaired to the wiring.
Notes: 
Repaired wiring and replaced stop switch that was broke.
Date requested: 
2017-06-22
Date received: 
2017-06-22
Root Cause: 
Part Failure
Status: 
complete
Cost: 
60.00
Time spent: 
1hr
Completed: 
completed
Date completed: 
2017-06-22