User login

Work Order 15949

Type of work: 
Oven
Equipment: 
Describe the problem: 
12-door oven has an issue with the left hand side troughs that dont allow them to drain, consequently the troughs spill over on to the decks when steaming. this affects all of the decks.
Date requested: 
2024-05-09
Date received: 
2024-05-09
Status: 
replaced button that was broken and checked drainage, opened bottom drain hole
Completed: 
completed
Priority: 
Low
« Back