User login

Work Order 14391

Type of work: 
Other
Other type of work: 
re-weld pipes , bar inside the LVO
Equipment: 
Describe the problem: 
There is one side of a bracket to the heat tunnel that is not connected. The two far ends of both top bars going to the back of the LVO, are disconnected on the ends. the rest of it is still connected, but it still worries me.
Notes: 
sending email with pictures on where.
Date requested: 
2023-08-23
Date received: 
2023-08-23
Status: 
I will keep an eye on it. It is still stable. As long as we don't sbuse it anymore it will be ok.
Completed: 
completed
Priority: 
High
« Back