CREAMERY - PRODUCTION


Work Orders

New work order

Date requestedsort icon Type Problem Cost Time spent Status
2026-05-29 Other Painting Production door needs some TLC. New kick plate and paint
2026-04-04 Freezer We just got the new seal for the gelato chest freezer that needs to be installed at your leisure. complete
2026-03-31 Need wheelz put on filtration system. Hopefully today or tomorrow. Plz complete
2026-03-25 Plumbing The new hose head that was installed in production is leaking and not spraying well replaced
2026-03-23 HVAC Production is too warm, AC doesn't seem to be working properly. reset the thermostat and reprogrammed to not be 85. All functioning currently we will see how this change affects climate.
2026-03-14 Plumbing We would like a normal hose attachment for the production hose next to gelato to replace the weird long wand we currently have set up. replaced
2026-03-14 Plumbing The production sinks are all draining slowly leading me to believe there may be something stuck inside the pipes somewhere. It probably just needs to be snaked or something. repaired drains and replaced o rings
2026-03-05 Front wheel on gelato cart needs to be replaced. Myself or Justin can show you. complete

Maintenance Record

New maintenance record